常用質(zhì)量管理術(shù)語縮寫,你知道哪些?

嘉峪檢測網(wǎng)        2015-10-03 10:36

常用質(zhì)量管理術(shù)語縮寫

常用質(zhì)量管理術(shù)語縮寫

 

1.PDCA:Plan、Do、Check、Action 策劃、實施、檢查、處置

2.PPAP:Production PartApproval Process生產(chǎn)件批準(zhǔn)程序

3.APQP:Advanced ProductQuality Planning產(chǎn)品質(zhì)量先期策劃

4.FMEA:Potential FailureMode and Effects Analysis 潛在失效模式及后果分析

5.SPC:Statistical ProcessControl統(tǒng)計過程控制

 

6.MSA:Measurement SystemAnalysis 測量系統(tǒng)控制

7.CP:Control Plan 控制計劃

8.QSA:Quality SystemAssessment 質(zhì)量體系評定

9.PPM:Parts Per Million 每百萬零件不合格數(shù)

10.QM:Quality Manua質(zhì)量手冊

 

11.QP:Quality Procedure質(zhì)量程序文件/Quality Planning質(zhì)量策劃/Quality Plan 質(zhì)量計劃

12.CMK:機器能力指數(shù)

13.CPK:過程能力指數(shù)

14.CAD:Computer-AidedDesign 計算機輔助能力設(shè)計

15.OEE:Overall Equipment Effectiveness 設(shè)備總效率

 

16.QFD:Quality FunctionDeployment質(zhì)量功能展開

17.FIFO:First in, First out先進先出

18.COPS:Customer OrientedProcesses顧客導(dǎo)向過程

19.TCQ:Time、Cost、Quality時間、成本、質(zhì)量

20.MPS:Management Processes管理性過程

 

21.SPS:Support Processes支持性過程

22.TQM:Total QualityManagement全面質(zhì)量管理

23.PQA:Product QualityAssurance產(chǎn)品質(zhì)量保證(免檢)

24.QP-QC-QI:質(zhì)量三步曲,質(zhì)量計劃-質(zhì)量控制-質(zhì)量改進

25.QAF:Quality AssuranceFile質(zhì)量保證文件

 

26.QAP:Quality AssurancePlan質(zhì)量保證計劃

27.PFC:Process Flow Chart過程流程圖

28.QMS:Quality ManagementSystems質(zhì)量管理體系

29.JIT:Just In Time準(zhǔn)時(交貨)

30.ERP:EnterpriseRequirement Planning企業(yè)需求計劃

 

31.QC:Quality Control 質(zhì)量控制

32.QA:Quality Audit 質(zhì)量審核/QalityAssurance 質(zhì)量保證

33.IQC:In Come QualityControl 進貨質(zhì)量控制

34.IPQC:In Process QualityControl 過程質(zhì)量控制

35.FQC:Final QualityControl 成品質(zhì)量控制

 

36.OQC:Out Quality Control 出貨質(zhì)量控制

37.4M1E:Man、Machine、Material、Method、Environment人、機、料、法、環(huán)

38.5W1H:Why、What、Who、When、Where、How 為何/做什么/誰做/時間/地點/如何做

39.6S:Seiri、Seiton、Seiso、Seiketsu、Shitsuke、Safety 整理、整頓、清掃、清潔、素養(yǎng)、安全

40.TRI值:Total Record Injury(三種)可記錄工傷值

 

41.SMART:精明原則,SpecificMeasurable Achievable Result Oriented Timed(具體的描述、可以測量的、可以通過努力實現(xiàn)的、有結(jié)果導(dǎo)向性的、有時間性的)

 

 

 

企業(yè)常用英文縮寫

 

1.5S:5S管理
2.ABC:作業(yè)制成本制度(Activity-BasedCosting)

3.ABB:實施作業(yè)制預(yù)算制度(Activity-BasedBudgeting)

4.ABM:作業(yè)制成本管理(Activity-BaseManagement)

5.APS:先進規(guī)畫與排程系統(tǒng)(AdvancedPlanning and Scheduling)

 

6.ASP:應(yīng)用程序服務(wù)供貨商(ApplicationService Provider)

7.ATP:可承諾量(Available ToPromise)

8.AVL:認可的供貨商清單(ApprovedVendor List)

9.BOM:物料清單(Bill OfMaterial)

10.BPR:企業(yè)流程再造(BusinessProcess Reengineering)

 

11.BSC:平衡記分卡(BalancedScoreCard)

12.BTF:計劃生產(chǎn)(Build ToForecast)

13.BTO:訂單生產(chǎn)(Build To Order)

14.CPM:要徑法(Critical PathMethod)

15.CPM:每一百萬個使用者會有幾次抱怨(Complaintper Million)

 

16.CRM:客戶關(guān)系管理(CustomerRelationship Management)

17.CRP:產(chǎn)能需求規(guī)劃(CapacityRequirements Planning)

18.CTO:客制化生產(chǎn)(ConfigurationTo Order)

19.DBR:限制驅(qū)導(dǎo)式排程法(Drum-Buffer-Rope)

20.DMT:成熟度驗證(DesignMaturing Testing)

 

21.DVT:設(shè)計驗證(DesignVerification Testing)

22.DRP:運銷資源計劃(DistributionResource Planning)

23.DSS:決策支持系統(tǒng)(DecisionSupport System)

24.EC:設(shè)計變更/工程變更(EngineerChange)

25.EC:電子商務(wù)(ElectronicCommerce)

 

26.ECRN:原件規(guī)格更改通知(EngineerChange Request Notice)

27.EDI:電子數(shù)據(jù)交換(ElectronicData Interchange)

28.EIS:主管決策系統(tǒng)(ExecutiveInformation System)

29.EMC:電磁相容(ElectricMagnetic Capability)

30.EOQ:基本經(jīng)濟訂購量(EconomicOrder Quantity)

 

31.ERP:企業(yè)資源規(guī)劃(EnterpriseResource Planning)

32.FAE:應(yīng)用工程師(FieldApplication Engineer)

33.FCST:預(yù)估(Forecast)

34.FMS:彈性制造系統(tǒng)(FlexibleManufacture System)

35.FQC:成品質(zhì)量管理(Finish orFinal Quality Control)

 

36.IPQC: 制程質(zhì)量管理(In-ProcessQuality Control)

37.IQC:進料質(zhì)量管理(IncomingQuality Control)

38.ISO:國際標(biāo)準(zhǔn)組織(InternationalOrganization for Standardization)

39.ISAR:首批樣品認可(InitialSample Approval Request)

40.JIT:實時管理(Just In Time)

 

41.KM:知識管理(KnowledgeManagement)

42.L4L:逐批訂購法(Lot-for-Lot)

43.LTC:最小總成本法(Least TotalCost)

44.LUC:最小單位成本(Least UnitCost)

45.MES:制造執(zhí)行系統(tǒng)(ManufacturingExecution System)

 

46.MO:制令(Manufacture Order)

47.MPS:主生產(chǎn)排程(MasterProduction Schedule)

48.MRO:請修(購)單(MaintenanceRepair Operation)

49.MRP:物料需求規(guī)劃(MaterialRequirement Planning)

50.MRPII:制造資源計劃(ManufacturingResource Planning)

 

51.NFCF:更改預(yù)估量的通知Notice forChanging Forecast

52.OEM:委托代工(OriginalEquipment Manufacture)

53.ODM:委托設(shè)計與制造(OriginalDesign & Manufacture)

54.OLAP:在線分析處理(On-LineAnalytical Processing)

55.OLTP:在線交易處理(On-LineTransaction Processing)

 

56.OPT:最佳生產(chǎn)技術(shù)(OptimizedProduction Technology)

57.OQC:出貨質(zhì)量管理(Out-goingQuality Control)

58.PDCA:PDCA管理循環(huán)(Plan-Do-Check-Action)

59.PDM:產(chǎn)品數(shù)據(jù)管理系統(tǒng)(ProductData Management)

60.PERT:計劃評核術(shù)(ProgramEvaluation and Review Technique)

 

61.PO:訂單(Purchase Order)

62.POH:預(yù)估在手量(Product onHand)

63.PR:采購申請(PurchaseRequest)

64.QA:品質(zhì)保證(QualityAssurance)

65.QC:質(zhì)量管理(Quality Control)

 

66.QCC:品管圈(Quality ControlCircle)

67.QE:品質(zhì)工程(QualityEngineering)

68.RCCP:粗略產(chǎn)能規(guī)劃(Rough CutCapacity Planning)

69.RMA:退貨驗收(ReturnedMaterial Approval)

70.ROP:再訂購點(Re-Order Point)

 

71.SCM:供應(yīng)鏈管理(Supply ChainManagement)

72.SFC:現(xiàn)場控制(Shop FloorControl)

73.SIS:策略信息系統(tǒng)(StrategicInformation System)

74.SO:訂單(Sales Order)

75.SOR:特殊訂單需求(Special OrderRequest)

 

76.SPC:統(tǒng)計制程管制(StatisticProcess Control)

77.TOC:限制理論(Theory ofConstraints)

78.TPM:全面生產(chǎn)管理(TotalProduction Management)

79.TQC:全面質(zhì)量管理(Total QualityControl)

80.TQM:全面品質(zhì)管理(Total QualityManagement)

81.WIP:在制品(Work In Process)

分享到:

來源:AnyTesting